Infiniti

Infiniti QX30 MB CLA250 CLA45 AMG GLA250 GLA45 AMG 2.0L Starter 438000-205 2014-2020

CODE: V1-16098
Infiniti QX30 MB CLA250 CLA45 AMG GLA250 GLA45 AMG 2.0L Starter 438000-205 2014-2020 image 1
Infiniti QX30 MB CLA250 CLA45 AMG GLA250 GLA45 AMG 2.0L Starter 438000-205 2014-2020 image 2
Infiniti QX30 MB CLA250 CLA45 AMG GLA250 GLA45 AMG 2.0L Starter 438000-205 2014-2020 image 3
Infiniti QX30 MB CLA250 CLA45 AMG GLA250 GLA45 AMG 2.0L Starter 438000-205 2014-2020 image 1
Infiniti QX30 MB CLA250 CLA45 AMG GLA250 GLA45 AMG 2.0L Starter 438000-205 2014-2020 image 2
Infiniti QX30 MB CLA250 CLA45 AMG GLA250 GLA45 AMG 2.0L Starter 438000-205 2014-2020 image 3
-24%
Free Shipping
$242.35
$185.00 In Stock Sold out
Notify when available

FAST. SECURE. RELIABLE.

25+ YEARS OF EXPERIENCE

COVERAGE AVAILABLE

  • Product info
  • Description
  • Compatibility
  • Shipping

Attributes

Manufacturer DENSO
Case Grounding Grounded Case
Design PMGR
Family PA90L
Ground G
Kw 1.7
Moiunting Bolt Hole Quantity 2
Mounting Bolt Hole Quantity 2
Mounting Type Flange
Mtg Config Code B
Mtg Type FLANGE
Num Mtg Holes 2
OEM Manufacturer DENSO
Power Rating 1.7
Rotation Direction CCW
Starter Rotation Counterclockwise (Left)
Tooth Quantity 15
Type Starter
Voltage 12V

Reference Numbers

Bosch Aftermarket SR0509N (New)
Datsun/Nissan 23300-5DA0B
DENSO 438000-205, 438000-2050, MS438000-2050
Lester 16098
Mercedes-Benz 645-906-08-00, 645-906-08-00-80, A645-906-08-00
PIC 190-981
Voltux V1-16098, V1-443507
WAI 16098N

Vehicle Fitment (Buyer's Guide)

Make Model / Engine / Years
Infiniti QX30 • L4 2.0L (1991cc) • 2017–2019
Mercedes-Benz CLA250 • L4 2.0L (1991cc) • 2014–2019
CLA45 AMG • L4 2.0L (1991cc) • 2014–2019
GLA250 • L4 2.0L (1991cc) • 2015–2020
GLA45 AMG • L4 2.0L (1991cc) • 2015–2019
Reference Numbers
Bosch Aftermarket SR0509N (New)
DENSO 438000-205, 438000-2050, MS438000-2050
Lester 16098
PIC 190-981
Voltux V1-16098, V1-443507
WAI 16098N
Compatibility (Buyer’s Guide)
Infiniti Truck QX30 L4 2.0L 1991CC 2017-2019
Mercedes-Benz Car CLA250 L4 2.0L 1991CC 2014-2019
Mercedes-Benz Car CLA45 AMG L4 2.0L 1991CC 2014-2019
Mercedes-Benz Truck GLA250 L4 2.0L 1991CC 2015-2020
Mercedes-Benz Truck GLA45 AMG L4 2.0L 1991CC 2015-2019

Product Compatibility Chart

3 Vehicles
NO Make Model Years
1 Infiniti Qx30 2017-2019
2 Mercedes-Benz Cla 2014-2019
3 Mercedes-Benz Gla 2015-2020

Japan Direct Japanese Auto Parts Inc.

Fulfillment & Logistics Protocol

Japan Direct coordinates both heavy freight transportation and standard parcel courier services depending on the dimensional profile and handling requirements of the automotive components being shipped.

  • LTL Freight Shipments: Engines, transmissions, front clips, differentials, wheel sets, and oversized assemblies are professionally palletized and transported through commercial Less-Than-Truckload freight networks.
  • Parcel Shipments: Smaller components including taillights, headlights, shocks, ECUs, trim pieces, sensors, and boxed accessories are securely packaged and shipped through insured parcel courier services.
  • Commercial Delivery: Requires a verified commercial address equipped with loading dock access or on-site forklift capability or must purchase liftgate service.
  • Residential Curbside: Residential freight delivery extends to curbside or driveway threshold locations only.
  • Liftgate Provision: Hydraulic liftgate service is mandatory for locations lacking heavy unloading equipment.
  • Terminal Collection: Customers may arrange direct collection from the carrier’s regional freight terminal.

Freight costs are calculated dynamically at checkout, factoring dimensional weight, destination region, carrier routing, and unloading requirements.

Action Required Accurate facility designation and delivery information are mandatory to prevent carrier rejection, reassignment fees, and transit delays.

Our fulfillment facilities operate on structured efficiency protocols to ensure secure packaging integrity and rapid deployment of all inventory categories.

  • Standard processing and secure palletization are finalized within 1 to 2 business days following payment verification.
  • The daily shipping manifest closes at 14:00 EST. Orders finalized after this window enter the subsequent business-day queue.
  • Should a unit require secondary diagnostic verification or reinforced freight preparation, a fulfillment specialist will contact you directly.

Our logistics infrastructure spans across North America, facilitating both freight and parcel deliveries throughout standard commercial and residential delivery sectors.

  • Comprehensive shipping coverage across the continental United States and Canada.
  • We currently do not offer direct checkout shipping services to Puerto Rico, Alaska, Hawaii, the U.S. Virgin Islands, or similar offshore and remote territories.
  • Deliveries to isolated rural routes, islands, or restricted-access freight regions may require specialized carrier routing and revised transit schedules.
  • Customers requiring delivery to special-case destinations are encouraged to contact our logistics division directly for manual freight assessment and routing options.
  • Due to dimensional freight limitations, we cannot deliver to P.O. Boxes or military APO/FPO installations.

Routing Advisory Remote-region shipments are evaluated individually based on carrier access, freight class, and terminal availability.

Total shipment transparency is maintained throughout the transit lifecycle. A unique Carrier Waybill Tracking identifier is generated and transmitted to your registered email immediately after dispatch clearance. For smaller packages, a tracking number will be sent to your email once available.

System Note Carrier digital portals may require up to 24 hours to synchronize shipment data after freight handover.

Upon arrival, the consignee assumes responsibility for inspecting freight or parcel shipments prior to legally accepting transfer of custody.

  • Visual Audit: Inspect the pallet, shrink wrap, packaging integrity, and component housing before signing the Bill of Lading (BOL) or courier documentation.
  • Documenting Discrepancies: If transit damage is detected, annotate “Received Damaged” on the carrier manifest and capture photographic evidence immediately.
  • Refusal of Custody: If a shipment has sustained major structural transit damage, legally refuse the shipment and notify our logistics division immediately.

Reverse logistics procedures must follow authorized pathways to ensure controlled handling, inspection integrity, and asset recovery compliance.

  • An active Return Authorization (RA) number is mandatory for all inbound return shipments. Freight arriving without authorized documentation will be refused at receiving.
  • Customers assume responsibility for coordinating and financing return freight unless otherwise approved in writing by our warranty division.
  • Returned inventory undergoes a comprehensive inspection and verification process prior to refund approval or replacement authorization.

Recently Viewed